10-50TD Virgin Small coconut oil plant
Contact Me
Name :Helen
Skype: LD021
Mobile: 86 15838271596
Product Description
Oil content in all kinds of raw materials
Recovery process: solvent condensator
1). Adopt stainless steel fixed grid plate and increase the horizontal grid plates, which can prevent the strong miscella from flowing back to the blanking case, so as to ensure good extraction effect.
2). Specially suitable for the extraction of various pre-pressed meals.
3). The feeding system can adjust the rotating speed of airlock and main engine according to the feeding quantity and maintain a certain material level, which is beneficial to the micro negative pressure inside the extractor and reduce the solvent leakage.
4). The rotocel extractor is driven by rack, with unique rotor of balanced design, low rotating speed, low power, smooth operation, no noise and quite low maintenance cost;
5). The advanced miscella circulation process is designed to reduce the fresh solvent inputs, reduce the residual oil in meal, improve the miscella concentration and save energy by reducing the evaporation capacity.
6). The high material layer of the extractor helps to form immersion extraction, reduce the meal quality in miscella, improve the quality of crude oil and reduce the evaporation system scaling.
Pictures of coconut oil plant
3.Technical Parameters of coconut oil plant
Capacity |
300T/D |
Residual oil in meal |
≤ 1% |
Solvent consumption |
≤ 2Kg/T (No.6 solvent oil) |
Crude oil moisture and volatile matter |
≤ 0.30% |
Power consumption |
≤ 15KWh/T |
Steam consumption |
≤ 280KG/T (0.8MPa) |
Finished meal moisture |
≤ 13% (adjustable) |
Residual solvent in finished meal |
≤300PPM (qualified detonated experiment) |
Our Services
Coconut oil plant
We Promise Best Service
1.Ensure provide complete sets of equipment and accessories timely.
2.Ensure that one-time installation debugging acceptance.
3.To provide high quality material with preferential price.
4.Priority to provide customer our new craftworks and products.
5.Free training technological operator to ensure the trained staff can operation independently.
6.In the installation process,we will appoint an installation supervision staff on the spot.
7.we will offer an experienced project manager, organize a good installation team for the work of field installation debugging.
Company InformationOur Factory
Packaging & Shipping
Delivery Goods