GoLD supplier top quality instant noodle manufacturer in china
Description1. Salt Water Mixer: water mixed with additive such as salt, alkali.
2. Brine metering device: measuring the water demand for every pot flour so as to control quantitatively the salt waer volu me from salt water mixer into dough mixer.
3. Dough mixer: flour and water combined and mixed full.
4. Aging machine: dough aging, improve the elasticity of the flour
5. Pressing machine: pressing and cutting
6. Steaming machine: steaming the formed noodles
7. Cutting& Dividing machine: cutting, folding, dividing,, forming the dough pieces and entering boxes, it can form square
or circular dough pieces from different molds.
8. Frying machine: dehydrated by frying, fixing the shape of dough pieces, making dough crispy to taste good
9..Cooling machine: lower the temperature of dough pieces to meet the demand of packing.
10 Conveyor: conveying finished instant noodles to each packing line.
SpecificationCapacity |
Power |
Roller width |
Dimension(mm) |
worker |
11000pics/8h |
11kw |
210mm |
22000*4000*3500 |
4 |
40000pics/8h |
50kw |
240mm |
58000*5000*5000 |
4 |
60000pics/8h |
56kw |
330mm |
63000*5000 *5000 |
4 |
80000pics/8 h |
95kw |
450mm |
75000 * 6000* 5000 |
5 |
100000-120000pics/8h |
110kw |
510mm |
80000 *7000 *5500 |
5 |
200000pics/8h |
114kw |
765mm |
110000*7000 * 5500 |
8 |
240000pics/8h |
125KW |
850mm |
120000*7000*5500 |
8 |
Output Picture
Packing Payment Shipment FAQ
1 |
WHICH PAYMENT TERLD IS PERFERED BY YOUR COMPANY ? |
|
T/T,L/C,Western union, Money gram, Secure payment, Trade assurance. |
2 |
WHICH KIND OF WOOD PACKAGE WILL YOU USE? HOW WILL IT BE CHARGED ? |
|
The package for sea cargo and air cargo will be packed by Non fumigation export standard wooden case,we will charge for the package accordingly because our package is made by expert packing company |
3 |
WHAT IS YOUR QUALITY GUARANTEE PERIOD? |
|
Quality guarantee term is for one year. You are welcome to contact us at any time. |
4 |
WHEN SENDING PAYMENT, WHAT SHOULD BE PAID ATTETION? |
|
Please be confirmed that customer can pay to LD INTERNATIONAL CO.LTD orShandong LD MACHINERY CO,LTD two US Dollars company account. Do not payment to any personal bank account. |
5 |
HOW ABOUT INSTALLATION AND TRAINING? |
|
--For single, simple line machine,machine is set before delivery. When the machine arrives, connect with the electricity, then the machine can work. --For complicated production line, our engineer can be sent to clients' work shop to help install, adjust and train local workers until they master them all. |
6 |
HOW ABOUT THE SPARE PARTS? |
|
As for the spare parts, always suggest client buy machine together with some wearable spare parts. In case any damage, can change at once, will not delay the production. |
7 |
DELIVERY METHOD ? |
|
We can send goods by sea, air, express, train,or by land, as customers' request |
8 |
VPLTAGE CAN BE CUSTOMIZED ? |
|
Yes. |
9 |
HOW ABOUT CERTIFICATE? |
|
Our factory has gained CE, ISO9001 authentication.if you need other certificate, please inform us. "Quality is priority". We always pay LD attention on quality controlling from the beginning to the end. |
10 |
IF I WANT TO BUY THE MACHINE , WHAT'S INFORMATION DO U NEED? |
|
Please inform us: - What's the capacity do you want? - The more information of yourraw material materials, such as the size, moisture, etc -output size and shape. |
Contact