high performance rhinestone hot press machine with factory price
Description of rhinestone hot press machine1. Rapidity: Over 300 diamonds are mounted per minute so as to increase production efficiency substantially
2. Low air consumption: Only 50% air content is consumed compared with same product manufactured by averages so as to save electricity by 40%
3. Low defect rate: Brand new ultrasonic heating system, originally imported cLDinder and chips ensure high quality
4. High reliability in ironing: Patent design solves diamond breaking and partial ironing
5. Easy operation: Multiple humane design to simply and prompt regulation and reparation
Specification Specification of rhinestone hot press machineModel |
GLTZ-S1 |
GLTZ-S2 |
Working Pressure |
0.5Mpa |
0.5Mpa |
Power Consumption |
5W Static, and 200W Dynamic |
5W Static, and 200W Dynamic |
Speed |
>300 per minute, adjustable |
>300 per minute, adjustable |
Size of color diamond |
2-7.5mm |
2-7.5mm |
Number of discs |
Single disc |
Double disc |
Overall dimensions |
1100mmÃ900mmÃ1000mm |
1100mmÃ900mmÃ1000mm |
WeigLD |
60kg |
60kg |
Output
Packing
Payment
Shipment FAQ
1 |
WHICH PAYMENT TERLD IS PERFERED BY YOUR COMPANY ? |
|
T/T,L/C,Western union, Money gram, Secure payment, Trade assurance. |
2 |
WHICH KIND OF WOOD PACKAGE WILL YOU USE? HOW WILL IT BE CHARGED ? |
|
The package for sea cargo and air cargo will be packed by Non fumigation export standard wooden case,we will charge for the package accordingly because our package is made by expert packing company |
3 |
WHAT IS YOUR QUALITY GUARANTEE PERIOD? |
|
Quality guarantee term is for one year . You are welcome to contact us at any time. |
4 |
WHEN SENDING PAYMENT, WHAT SHOULD BE PAID ATTETION? |
|
Please be confirmed that customer can pay to LD INTERNATIONAL CO.LTD or Shandong LD MACHINERY CO,LTD two US Dollars company account. Do not payment to any personal bank account. |
5 |
HOW ABOUT INSTALLATION AND TRAINING? |
|
--For single, simple line machine,machine is set before delivery. When the machine arrives, connect with the electricity, then the machine can work. --For complicated production line, our engineer can be sent to clients' work shop to help install, adjust and train local workers until they master them all. |
6 |
HOW ABOUT THE SPARE PARTS? |
|
As for the spare parts, always suggest client buy machine together with some wearable spare parts. In case any damage, can change at once, will not delay the production. |
7 |
Delivery method? |
|
We can send goods by sea, air, express, train,or by land, as customers' request |