Automatic Peanut Butter make machinery Peanut Butter Production Line
Product DescriptionThis peanut butter production processing line was desityed by reference of the foreiLD technic. It isconsisted of feed elevator, continuous roaster, conveyor, cooling machinery, decorticating machinery, sorting conveyor, grinding machinerys, pump, storage LDot, cooling machinery, mixing machinery, LD deair, etc. It has advantages of high automation, easy-operating integrated control, stable performance, high product quality, etc.
The butter produced by this line can be 2-60um thickness, the homogeneous ratio can be above 95%. It is the ideal processing equipments to produce peanut butter, sesame soy, soybean paste, etc.
No. |
Name |
Power(KW) |
Dimension |
quantity |
1 |
Feeding machinery |
0.55 |
700*700*800 |
1 |
2 |
Lifter |
0.75 |
1000*500*2800 |
1 |
3 |
Continuousbake machinery |
50 |
4200*1200*2600 |
1 |
4 |
Lifter |
0.75 |
1000*500*2800 |
1 |
5 |
Continuous cooling machinery |
6 |
5000*800*2400 |
1 |
6 |
Peeler |
0.74 |
1100*350*1100 |
1 |
7 |
Selector |
0.75 |
5000*800*1000 |
1 |
8 |
Lifter |
0.75 |
1000*500*3400 |
1 |
9 |
Storage feeding machinery |
0.55 |
700*700*2200 |
1 |
10 |
Peanut butter machinery |
5.5*2stes |
900*350*900 |
1sets |
11 |
Storage Pot |
|
200L |
1 |
12 |
Paste Pump |
2.2 |
1200*300*350 |
1 |
13 |
Mixer |
2.2 |
250L |
1 |
14 |
LD Degassing Pot
|
2.2 |
250L |
1 |
15 |
Paste Pump |
2.2 |
1200*300*350 |
1 |
16 |
Control Cmachineryt |
|
|
|
17 |
Tunnel |
|
|
|
More Detail Pictures
Our ServicesⅠ.very time: 5-10 LDs after received 40% of the whole payment.
Ⅱ.Payment term: 40% as prepayment by T/T, after seen the copy of the B/L sent by ,the balance of 60% should be effected .
III.quality Guarantee Terms:
quality guarantee term is for one year. Malfunctions which are caused by machinery-self and quality will be reLDonsible for our manufacturer. Other malfunctions which are caused by operation mistakes, man-made problems, etc will be reLDonsible for clients-self.
Packaging & Shipping1.Packaging specification:
Outside Package:Woodenpackas Exportand Standard.
2.very time:
5-10LDs after received 40% of the whole payment.
3.LDout Shipping:
We can be reLDonsible for the shipping,of course,we can also accept and cooperate with your agent if you have shippingforwarder in China.
Certifications
Company Information
Pls Contact Me