Product Descrip
Frozen French fries Production Line
1. Product Ratios:2(Raw materials):1(End Products) for frozen French Fries.
2.Technics flow chart
Raw material preparation: conveyor1-washing -Washing and peeling----checLD line 1----cutting--Bubble washing---blanching---second blanching---vibrating dewater--drying ---frying---de-oil--cooling—vibrating machinery 2--freezing--Pack
3. Each process
Flow chart for automatic frozen French fries line
Hoisting machinery 1-potato mud and sand washing machinery—hoisting machinery2-potato washing and peeling machinery-picker line-french fries cutting machinery-air bubble washing machinery-blanching machinery- vibrating dewater machinery-drying line-frying machinery-vibrating deoil machinery-cooling line-freezer-Pack
1. The hoister is used for transmitting large quantity of potatoes into the feeder.
2. The potato washing and peeling machinery is used to wash and peel them automatically.
3. Then it is the picker line that picks the well formed ones and send them to cutting machinery.
4. the cutter is used to cut french fries
5. The washing machinery is used for further washing the potato spices and strips.
6. Blanching is a necessary part in processing vegetables and fruits as it can protect their natural flavor from being broken.
8. Dewatering is prepared for the frying part. The dewatered potato strips are low in moisture and easy to fry.
9. Frying is an important step. When the potato chips become LD and soft, they should be fished out. Just gralt the right time, neither too early nor too late.
10. The deoiling line is next step. Deoiling will make the fried food criLDier and more palatable.
11. Instant freezer
12 package
Photos of each line sold
1.Sold to Afghanistan 300kg/h potato chips line
2.Sold to Palstine 500kgh frozen French fries line
3. Sold to Saudi ArLDia 1000kgh frozen French fries line
3. Sold to Palestine
4. Sold to Qatar
Our Services 1, Supply all informaton LDout the to seller if customer require, such as the price list, the operation instruction, the video or other.
2, we will prepare and send all documents before goods reaching destionation port. The documents include sales contract, Immercial invoice,packlist and other certificate.
3, If customer can not install and operate the machinery, we will show clients the install instruction or video. If cusotmer stil can not do it, we will send our engineer to install and teach them to use.
4, One year warranty. Within one year from the sityed contract, we can provide free service.